Head Office: 
Midlands: 
Northern: 
Manchester: 
Birmingham: 
Carlisle: 

Instilling Confidence in Clients 

Our reputation is established and we get repeat business from our long-standing clients who know that they get the best service on the market and have confidence that we install and document our work to the highest standards. 

Leaders in Quality & Safety 

Our quality assurance processes are industry leading. We have our own staff that operate as independent quality and health and safety inspectors to ensure quality and safety is a top priority. 

An Accredited Contractor 

Established in 2007, we are accredited with IFC, ASFP, ISO 9001, working throughout the UK as passive fire protection specialists. We are UKAS accredited and our dedicated team are QA professionals. 

Fire Protection Surveying UK  

GRJ Contracting can undertake fire protection surveying and fire compartmentation inspections on your structure, whatever the size or age of your building may be. We comply with up-to-date fire safety legislation and regulations to ensure life-saving protection with our structural steelwork coatings and other systems. Our surveying service also extends to on-site visits, during the actual construction phase of a scheme, from our SHEQ team; we also undertake quality inspections of intumescent coatings to structural steelwork. 
 
With expertise in fire protection and fire protection surveying, GRJ can professionally install passive fire protection materials and systems to create fire containment in order to protect life safety. Our technicians are well rounded and knowledgeable in all aspects of passive fire protection. For more information about our surveying click the button below and it will take you to our surveying website. 
Our specialists at GRJ Surveying can assist you with all areas of surveying, click the link below. 

Fire Compartmentation Inspections UK 

All of our fire compartmentation inspections are done by a team of experienced and qualified experts. Our fire protection contractors are certified through third-party accreditation schemes including UKAS, ASFP, CHAS, Cyber Essentials and more. 
 
Our process includes an inspection of your existing fire compartmentation, after which we deliver a comprehensive report of our findings. Should you need any remedial work, we will take care of it ensuring your property is compliant with the latest fire safety regulations. 
 
Trust GRJ Contracting to inspect and assess your building’s fire safety. Get in touch with our team today. 
Frequently Asked Questions 
A fire survey is a detailed, methodological examination of any commercial, public or residential property to determine whether a building is compliant with fire safety standards and to help minimise the risks of fire. 
A fire compartmentation survey deals specifically with the compartmentation measures in a building in order to determine their effectiveness in the event of a fire. The overall goal of a compartmentation survey is identifying whether the current fire protective measures are sufficient and efficient. 
Our comprehensive fire surveying process starts with identifying all areas that are of risk in the event of a fire. Then we look at the condition of your current firestopping measurements and passive fire protection system. Based on that we build a complete report of our findings and suggest areas that need to be addressed or improved. If there is any remedial work that needs to be undertaken as a result of our findings we can help carry it out to ensure your building remains protected. 

Our Expert Guides on surveying from our specialists at GRJ Surveying 

Click the images below to display our expert guides. 
Two Chamberlain Square

    Take the first step to protect your building 

Book a FREE SITE EVALUATION today and our team will be in touch to discuss how GRJ can offer a full personalised passive fire protection solution tailored to your business

OUR CLIENTS  

OUR PRODUCT PARTNERS 

Nullifire
Nullifire
Firetherm
Rockwool
Firehalt
Hilti
Promat
British Gypsum
Rockwool
Rockwool
Quelfire

"Project delivered on time" 

Please also accept our thanks to you and the team for your help in getting the project delivered on time and to a high-quality standard. 
 
Rob Morgan – Willmott Dixon 

RECENT PROJECTS… 

 
 
 
 
 

TWO CHAMBERLAIN SQUARE 

Two Chamberlain Square is the second building in the first phase of the Paradise development in central Birmingham. 
 
 
 
 
 
 
 
 
 
 

WARWICK ARTS CENTRE 

3 Arena Central will provide 240,000 sq ft of Grade A commercial space over ground and 13 upper floors opening out onto developing Bank Court within the heart central Birmingham. 
 
 
 
 
 
 
 
 
 
 

3 ARENA CENTRAL 

Warwick Arts Centre will see Willmott Dixon create the region’s leading cultural centre when complete in early 2021 that will be a key venue in Coventry’s year as UK City of Culture 2021. 
 
 
 
 
 
GRJ CONTRACTING 
GRJ Contracting Ltd was established in 2007 with the purpose of specialising in the design, supply, and installation of quality passive fire protection systems for the commercial and residential UK construction market. As an accredited company certified with IFC, ASFP, ISO 9001 and Cyber Essentials based in the Midlands, we operate nationwide on new build and legacy construction projects of all scales and our range of services includes Intumescent Coatings and Rigid Boarding systems for Structural Steelwork protection, Service Penetration Firestopping, Mineral Fibre Boarding systems for internal building fire compartmentation and more. 
Terms of Use | Privacy | Cookies | Copyright © 2024 GRJ Contracting Ltd. All Rights Reserved. Branding by Carl Murch Design. 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings