Project Details 

Client 

Willmott Dixon 

Location 

Staffordshire 

Sector 

Education 

Project Type 

New Build & Refurbishment 

Duration 

March 2024 – April 2026 (+a 3rd phase expected to complete end of Summer 2026) 

Our Role 

Sub-Contractor 

Contract Manager 

Harvey Braime 

Client Overview 

Willmott Dixon is a privately-owned construction contracting and interior fit-out group, delivering new build and refurbishment projects across a range of sectors including education, healthcare, housing and commercial. Founded in 1852, they are one of the UK's longest-established and most respected contractors. 
 
In 2018, they were one of only six companies to receive a Queen's Award for Enterprise in the Social Mobility category, and have been recognised as the UK's highest-ranked contractor in the Financial Times' Diversity Leaders list. 
 
They are targeting a net-zero carbon status by 2030, with all buildings delivered after this date also meeting net-zero standards. 
 
Their purpose is to deliver brilliant buildings, transform lives and strengthen communities, which closely aligns with GRJ Contracting's own values and approach to delivery. 

Project Challenges 

Each block within the development had to be completed within a strict three-month programme, ahead of the next student intake - leaving no room for delays. 
 
The buildings featured a high volume of repeat seals with very strict parameters, requiring multiple penetrations through bedroom entry fire walls in extremely close proximity to one another. Every service penetration demanded precise individual measurement and careful, accurate installation throughout. 

Our Approach 

To overcome the challenges of working at pace without compromising quality, GRJ designed an innovative fire batt template specifically for use within the multiple bedroom entry openings. This significantly improved installation efficiency and helped prevent potential access restrictions for ongoing works and other trades. 
 
Working collaboratively with Willmott Dixon and the M&E trade, GRJ introduced a new installation sequence that allowed the fire batt template to be installed ahead of the M&E works. This provided an effective and compliant setting out of service penetrations from the outset. Return visits were then carried out following M&E installations to complete the fire sealing around services within the tested detail. 

Scope of Works 

GRJ Contracting were responsible for the supply and installation of Nullifire and Quelfire passive fire protection systems throughout the Staffordshire University Village. Works spanned a complex of multiple buildings, including new-build townhouses and cluster blocks, a village hub and existing student accommodation refurbishments. 
 
Approximately 10,000 fire-stopping seals were installed across four levels and roof spaces to achieve compliant fire compartmentation across the development, over 3 phases: 

Phase 1 - Refurbishment 

GRJ undertook compartmentation surveys ahead of the refurbishment programme to identify existing PFP defects, missing protection and non-compliant installations. Working with the client, fire engineers and manufacturers including Nullifire and Quelfire, we developed and agreed compliant remediation solutions before works commenced. 
 
The refurbishment was delivered over three annual summer phases between 2024 and 2026, with only 12 weeks available each year while the accommodation was vacant. Detailed pre-planning and day-by-day programming enabled all phases to be delivered within programme and budget, with the final phase approximately 68% larger than the earlier phases. 

Phase 2 - New-Build Accommodation 

Early engagement from RIBA Stage 3 allowed GRJ to influence MEP coordination and develop a bespoke fire-stopping template system for the highly repetitive service penetrations through bedroom fire walls. 
 
Approximately 10,000 seals were installed across four levels and roof spaces. Fire batt templates were pre-set, core-drilled and labelled before installation, providing the M&E contractor with precise and compliant service locations. 
 
This innovative approach significantly reduced installation time, improved consistency and reduced the risk of MEP and fire-stopping errors. The works were completed ahead of programme with minimal return issues. 

Phase 3 - Net Zero Village Hub 

The CLT construction of the Net Zero Village Hub presented additional challenges due to limitations in tested fire-stopping solutions for CLT, alongside the requirement for an aesthetically finished black seal. 
 
GRJ worked closely with leading manufacturers and the project team to identify and develop suitable, compliant solutions that met both the technical and aesthetic requirements, delivering bespoke decorative firestopping within the CLT Village Hub, successfully combining fire performance with the architect’s aesthetic vision. 

Scope of Works 

Approximately 10,000 fire-stopping seals were completed across four levels and roof spaces, achieving compliant fire compartmentation throughout 
All works delivered within the programme, meeting strict deadlines tied to student intake dates 
Around 10 operatives on site at any one time, maintaining a fluid workflow and enabling quick response to changes in client requirements 
A successful apprenticeship opportunity was delivered during the project, with the apprentice working and learning alongside highly skilled, long-serving passive fire protection operatives 
Bespoke methodology reduced installation time and coordination risk. 
Successful introduction of QR-code digital fire-stopping records. 
Collaborative design approach ensured compliant solutions were agreed before construction. 
The scale, complexity and compressed programmes demanded a highly collaborative approach, with early engagement, detailed design development and innovative installation methodologies proving fundamental to the successful delivery of the project. 

Innovation & Digital Compliance 

Early collaboration with the project team and manufacturers ensured fire-stopping details, service setting out and non-standard solutions were agreed before installation, supporting compliance with the relevant tested systems and BS EN 1366-3. 
 
GRJ introduced an innovative pre-installed fire batt template system, allowing firestopping to be accurately set out and installed before M&E penetrations. This transformed the installation sequence, improving speed, quality and coordination while reducing material waste. 
 
The approach delivered a reported 108% productivity improvement and 60% reduction in waste compared with traditional PFP installation methods. Rigorous QA resulted in zero defects and zero snags, with the project achieving a 98% Willmott Dixon National Quality Inspection score and zero accidents. 
 
The project also saw the successful trial of GRJ's QR-code identification system, with each seal assigned a unique code linking directly to installation information, product literature and the specific fire-stopping detail. This provides a faster, more reliable method of inspection and record-keeping and is now being rolled out across the business. 

Client Testimonial 

"GRJ Contracting provided a proactive and excellent service in delivering the passive fire stopping works on our project. This was done through early engagement and collaboration to drive standard ways of working and simplify the processes on site to drive efficiency. 
 
Their team, led by Harvey Braime, were professional, knowledgeable, and worked safely and efficiently throughout. They demonstrated a professional and reliable approach throughout the project, with a strong focus on quality, compliance, and attention to detail, with good communication maintained throughout. 
 
We would have no hesitation in recommending GRJ Contracting for passive fire stopping works and look forward to continuing and improving our working relationship with them on all our projects through our supply chain agreement. 
 
The focus on cost certainty, quality installation and record keeping alongside operational excellence during the works all aligns with our values and needs as a Tier 1 contractor." 
 
- Ashley Devonport, Head of Quality, Willmott Dixon Construction Limited 

Health, Safety & Quality 

Our Installations achieved a score of 98% following a National Quality Inspection (NQI) audit, a commendable result given that works were approximately 90% complete at the time of inspection. Zero accidents were recorded on site throughout the duration of the project. 

Project Photography 

GRJ CONTRACTING 
GRJ Contracting Ltd was established in 2007 with the purpose of specialising in the design, supply, and installation of quality passive fire protection systems for the commercial and residential UK construction market. As an accredited company certified with Kiwa IFC, ASFP, ISO 9001, Cyber Essentials Plus, CHAS Advanced and SMAS based in the Midlands, we operate nationwide on new build and legacy construction projects of all scales and our range of services includes Intumescent Coatings and Rigid Boarding systems for Structural Steelwork protection, Service Penetration Firestopping, Mineral Fibre Boarding systems for internal building fire compartmentation and more. 
IFC Certification
Considerate Constructors Scheme
ISO 9001 Quality Management
ASFP
SafeContractor Approved
Constructionline Gold Member
CHAS Accredited Contractor
Terms of Use | Privacy | Cookies | Copyright © 2026 GRJ Contracting Ltd. All Rights Reserved. Branding by Carl Murch Design.